MCMBA: Kensington / Proud Lake Connector

For posting trail-specific conditions and problems

Re: MCMBA: Kensington / Proud Lake Connector

Postby WICCMB » May 28th, 2019, 10:24 am

The Kensington Connector (between Proud Lake Recreation Area loop 4 and the Milford Rd entrance to Kensington Metropark) will be one of the trails used this coming weekend for the Milford Bike Fest and Trail Challenge event. This is not a race, but a fun family-friendly event. If you haven't ridden the connector before, you will probably be surprised that it even exists. And although it is a linear trail that is only about 2 miles long, it's has some fun sections that will get you smiling. And it keeps you out of traffic! Come ride it!

For more information about the Milford Bike Fest, click here:
https://runsignup.com/Race/MI/Milford/BikeFest
User avatar
WICCMB
Administrator
 
Posts: 4179
Joined: June 21st, 2002, 1:29 am
Location: Wixom, MI

Re: MCMBA: Kensington / Proud Lake Connector

Postby Spinwheel » August 17th, 2019, 2:38 pm

I reported the big down tree located West of Old Plank / South of Horse trail.........to the Kensington Metro Park Manager.

Hopefully they will be able to clear this one.

Also have been pruning back the thorns on Proud Lake loops - together with Bill's awesome mowing, the trails are in pretty decent shape.

Ride on!
See you on the trail
User avatar
Spinwheel
 
Posts: 875
Joined: May 8th, 2003, 10:03 am
Location: SE Michigan Mountain Bike MECCA

Re: MCMBA: Kensington / Proud Lake Connector

Postby steveracer » August 17th, 2019, 7:50 pm

Spinwheel wrote:
Also have been pruning back the thorns on Proud Lake loops - together with Bill's awesome mowing, the trails are in pretty decent shape.

Ride on!
thanks Tim!


Sent from device. Excuse eras.
Hope is not a good strategy.
User avatar
steveracer
 
Posts: 267
Joined: April 19th, 2003, 7:37 am
Location: West Bloomfield

PreviousNext

Return to Trail Conditions

Who is online

Users browsing this forum: Google [Bot] and 3 guests

cron