by mtbrskier » April 6th, 2020, 3:57 pm
The section of trail on the western side of the property, along the existing pipeline corridor that has been well-overgrown is going to be ripped-up.
They have already placed all the survey markers, and the construction corridor is the easement between the blue & white flags.
All the section of trail between the Milford Trail (paved trail) and the fence line with Camp Dearborn is going to be impacted.
This includes the free-ride area.
I think most of the powerline section out along Commerce Road is safe if we are thinking of the same area.
The section most impacted are going to be the long switchbacks in the semi-cleared areas near the Camp Dearborn property line.
They are going to tear-up this section, and directional bore under the Huron River.
They have already done all the brush cutting and tree removal on the the south side of GM Road down through Kensington.
They haven't clear-cut the Milford trail section.....yet.